Keith Ware Hall

Image of the dining hall on the ground floor with tables and chairs.
Killeen, Texas
August, 2017

PHASE ONE

Phase one of this project included 3 upper floors (165 rooms) of Formula Blue corridors and guest room carpet change out, 36 room asbestos abatement plus 50% for the FF&E changed out at the same time. 3 lower floors (160 rooms) included a Formula Blue LVT flooring change out, 100% floor prep due to 1960’s concrete in bad shape plus again 50% FF&E. All public areas and corridors on the 1st floor was 100% renovated with new finishing’s, wall coverings, brand standard light fixtures upgrades, 2 custom-made wood ceiling fixtures in the breakfast area. In addition, we also did a complete FF&E change out throughout the public and breakfast areas plus we did a 100% renovation on the front desk and added a new stand-alone Self Check-In Kiosk.

PHASE TWO

Phase two included a complete roof replacement over the back of house, 225’ of new sewer line with 7 tie-ins all without closing the hotel, installation of 4 IHG building signs 6 stories up, all the public area brand standard art work, 8 DVQ room bathroom upgrade renovation (rooms that our Generals and Colonels stay in when they are on post), brought everything up to brand standard, 13 - 5’x8’ blast proof window change outs, change out all the ceiling tiles and paint the grid in the breakfast area plus some additional FF&E.